News

9. Conductix-Wampfler Fun-Triathlon - Athlets
21.07.2008

The Conductix-Wampfler Fun-Triathlon took place for the 9th time, on Saturday, July 12. Six single athletes and believe it or not, 11 teams who competed in a neck-and-neck race – that´s a new record!

Unveiling of the new Company Logo
05.05.2008

The official worldwide market launch by the new market leader for energy and data transmission systems / Important milestone in the integration process / New organizational structure combines strengths of both companies / Regional and industry-specific customer support / New logo and branding

Daniel Dörflinger new CEO of Wampfler AG
26.03.2008

Ziegler and Friedrich’s contracts end as planned mid 2008 / First phase of the integration accomplished successfully

MAN TGA WorldWide producec with Wampfler technology
12.03.2008

The new assembly plant of MAN Nutzfahrzeuge Group in th Polish town of Niepołomice / Complex roof construction for flexible media use / 15,000 trucks per year roll off the line / Assembly system from Wampfler AG sets standards throughout Europe

Automated Stacker Cranes of GPT in the Port of Antwerp
12.12.2007

Complete energy supply for ten Gottwald Port Technology automated stacker cranes / Operation in the Port of Antwerp / New cranes planned for further harbour facilities

Catalog Powertrans<sup>®</sup>-1b
20.08.2007

The Wampfler catalog Data Transmission Systems POWERTRANS® Ib has been revised. The approved system for digital data transmission via conductor rails, slip rings and cables is described in detail, including all components and types of operation

Automated Guided Vehicles powered by IPT<sup>&reg;</sup>
20.08.2007

Silent technology anniversary: 10 years of inductive power and data transfer / Global demand for innovative IPT® applications in conveyor technology is increasing / Ferrari contracts Wampfler AG for electrification of skillet lines

Wampfler Cable Trolleys Programs 0365 | 0370 | 0375
02.08.2007

Three new series for modern STS container cranes and high-capacity process cranes have been developed / optimized conception of the running gear / speeds of up to 300 m/minute are possible

Pages