Prozess-Krane

Process-Overhead Crane in a steelworkProcess-Overhead Crane in a steelworkProcess-Overhead Crane in a steelwork
Downloads: 

Process-Overhead Crane in a steelwork

Application
Process-Overhead Crane in a steelwork

Country

Czech Republic

City

Plzeò

Representative office

Conductix-Wampfler s.r.o.

Operator
Pilsen Steel, a.s.

Technical requirement [s]
Power supply for 2 crabs of a Process-Overhead Crane

Product [s]

Festoon System "M-Line Program 0330"

Cable sag
1,5 m

Voltage

400 V

Travel distance [Load]

2 x 23,5 m

Travel speed [Load]

50 m/min

Environmental condition [s]

Steelwork

Additional information [s]

crab no.1: 250 t ; crab no. 2: 80/20 t

Relevante Produkte

M-Line 0330 Series